Kryton material approved by PATHNYNJ for repairs on new World Trade Tower. NEDC create samples repairs for PATH on leaking sections. Kryton materials approved for use and applied by several WTC subcontractors to stop the sub-grade leaking.
Repeatedly Failed Crack Injection in lowest level of WTC to be replaced by Kryton Crystalline Crack Repair and Surface Applied Slurry – Water infiltration from wall slab joints and wall cracks.